深夜福利在线观看国产_日韩三级片视频免费在线播放网址_含羞草网站在线观看_自拍亚洲综合精品_欧美日韩亚洲中文在线观看_婷婷激情五月天在线观看_天堂视频在线观看_青草久久无码中文av_国产一级淫片免费大片_剃刮调教剃毛为奴


Chinese

ENGLISH

Xing Sheng

Contact Us

河北興盛塑料管業(yè)有限公司

Website     :gjteam.cn

Contact     :Manager Zhang

Phone       :13933323655

Mail          :hbxsslgy@163.com

Buy online:https://shop377465757.taobao.com/

Common problem Common-problem
PP pipe, pipe fitting bonding method

1. Wipe the socket side and the outside of the socket with dry cloth before bonding the pipe and fittings. Wipe the surface with acetone when there is grease.
 
2. The pipe section should be flat, vertical pipe axis and chamfered; Before bonding, the insertion line should be drawn and the test insertion should be carried out. The test insertion depth can only be inserted to 1/3 ~ 1/2 of the original depth. If the clearance is too large, the bonding method is strictly prohibited.
 
3. When applying adhesive, the inner side of the socket should be applied first, then the outer side of the socket. When applying adhesive, an appropriate amount should be evenly applied from axial direction to the outer side.
 
4. After the adhesive is applied, it is advisable to keep the external force applied unchanged within 1 minute, and keep the straightness and position of the interface correct.
 
5. After the completion of the bonding, wipe off the extruded excess adhesive in time, and do not force or force load during the curing time.
 
6. Adhesive joints shall not be constructed in rain or water, and shall not be operated under 5℃.
 
7. Connection procedure: preparation → cleaning face → trial insertion → brush adhesive → bonding → curing.

  • Official Website

  • Taobao Shop

  • Wechat Account